Project / Task: e.g., Bathroom Installation or Plumbing Maintenance
Client / Site: client/site details
Prepared by: Matthew Pooley
Date: 11/03/2026
1. Scope of Work
This method statement covers the safe and efficient execution of:
- Plumbing services (installation, repair, maintenance)
- Bathroom design and fitting
- Supply and installation of fixtures and equipment
- Any associated shop or on-site work
2. References and Standards
Work will comply with:
- Health and Safety at Work Act 1974
- Construction (Design and Management) Regulations 2015 (CDM 2015)
- Water Supply (Water Fittings) Regulations 1999
- BS 6700: Design, Installation, and Maintenance of Services
- Manufacturer instructions for all products and equipment used
3. Personnel and Responsibilities
- Site Manager / Supervisor: Oversees work, ensures method statement is followed, manages risks.
- Plumbers / Installers: Carry out work in accordance with this method statement and all safety procedures.
- All Staff: Responsible for their own safety, use of PPE, and reporting hazards or incidents.
4. Equipment and Materials
- Hand tools (wrenches, screwdrivers, pipe cutters, etc.)
- Power tools (drills, grinders – with PPE)
- Plumbing materials (pipes, fittings, sealants)
- Bathroom fixtures (sinks, toilets, showers, tiles)
- PPE: gloves, safety glasses, high-visibility clothing, safety footwear
5. Risk Assessment and Control Measures
Potential Hazards:
- Slips, trips, and falls
- Manual handling injuries
- Electrical hazards when working near live circuits
- Exposure to dust, chemicals, or sharp objects
Control Measures:
- Use of PPE at all times
- Site kept tidy; spillages cleaned promptly
- Manual handling training and mechanical aids used
- Isolate electrical circuits before work
- Adequate ventilation when using adhesives or chemicals
6. Work Procedure / Methodology
- Preparation:
- Review drawings and specifications
- Confirm materials and tools are available
- Carry out site inspection and identify hazards
- Execution:
- Isolate water and/or electricity as required
- Remove old fittings carefully, if applicable
- Install plumbing and bathroom fixtures according to manufacturer guidelines
- Connect and test water supply and drainage
- Ensure all work is secure, level, and free of leaks
- Inspection and Testing:
- Pressure test pipes and fittings
- Check for leaks and functionality of all fixtures
- Ensure compliance with regulatory standards
- Completion and Handover:
- Clean site thoroughly
- Provide client with operational instructions and safety advice
- Sign-off completion documentation
7. Emergency Procedures
- First aid kits available on site
- Emergency contacts posted for ambulance, fire, and site supervisor
- Procedure for stopping work immediately if hazards are identified
8. Environmental Considerations
- Dispose of waste materials responsibly
- Minimise water and energy use
- Protect client property from damage
9. Sign-Off
Prepared by: ___________________
Reviewed by: ___________________
Date: ___________________
Acknowledged by Site Supervisor: ___________________